TP

OPERATIONS SIMULATOR / HISTORICAL CAPACITY

Toothpaste PlantFactory → DC

Local simulation

From factory floor to delivery.

Explore the whole plant, from laminate to DC receipt. Lines 1–6 stay visible; seven other filling assets are grouped. The 1 billion tubes/year baseline is a scenario target, not measured output.

Capacity reference
18 SEP 2012

Historical capacity: September 2012 · Synthetic, uncalibrated schedules and logistics · Generic labels and a new process schematic · No live plant data